In power systems, transformers play a core role in voltage conversion and power distribution. The transformer turns ratio (the ratio of high-voltage side to low-voltage side voltage) and the vector group are the most fundamental parameters. If the turns ratio deviates, or if the vector group is incorrect, it will not only lead to abnormal output voltage, but a wrong vector group can even cause severe phase-to-phase short-circuit accidents at the moment of grid connection. Therefore, the measurement of turns ratio and vector group is a mandatory item in handover tests, post-overhaul tests, and routine preventive tests of transformers.

Traditional turns ratio bridges are cumbersome to operate and cannot directly measure the vector group. The Transformer Turns Ratio and Vector Group Tester developed by Kedian Zhongwei adopts modern digital sampling technology to perfectly combine ratio measurement with automatic vector group identification, significantly improving on-site testing efficiency.

I. Working Principle: High-Precision Sampling and Phase Comparison

The instrument internally generates a standard test excitation voltage through digital synthesis technology and applies it to the high-voltage side (or low-voltage side) of the transformer. The induced voltage on the other side of the transformer is synchronously collected through a high-precision AD converter.

The turns ratio is calculated based on the voltage ratio. Meanwhile, the CPU automatically calculates the transformer's vector group (e.g., Y/Δ-11) by comparing the phase relationship of the high and low voltage side voltages. The entire testing process is automatically controlled by the microprocessor, eliminating errors from manual calculation.

II. Core Technical Features

1. Innovative "Blind Test" Function
On-site testing often encounters situations where transformer nameplates are lost, illegible, or the internal wiring is unknown. The instrument features an automatic vector group identification (blind test) function. Operators do not need to preset the vector group on the instrument; they simply connect the high and low voltage test cables, and the instrument automatically determines whether it is Y/Δ, Y/Y, or Δ/Δ, and calculates the accurate turns ratio and vector group.

2. Simultaneous Three-Phase Measurement
For three-phase transformers, the instrument supports simultaneous voltage application and sampling of all three phases. A single wiring setup completes the turns ratio and error measurement for all three phases (AB, BC, CA), reducing testing time by two-thirds compared to traditional single-phase testing.

3. Strong Anti-Interference Capability and Wide Range
To address the complex electromagnetic environment in substations, the equipment incorporates anti-interference designs (such as variable frequency testing technology) at both hardware and software levels to ensure stable data without fluctuation. The turns ratio range is as wide as 0.9 to 10,000, meeting the testing requirements from distribution transformers to ultra-high voltage main transformers.

4. Built-in Large-Capacity Storage
The instrument has a built-in large-capacity memory that can save thousands of on-site test data records and is equipped with a USB interface for easy data export to a computer to generate test reports.

III. On-Site Application and Operation Key Points

  1. Strictly prohibit connecting the high and low voltage sides incorrectly. The "high voltage" terminals of the tester must be connected to the high-voltage winding of the transformer, and the "low voltage" terminals to the low-voltage winding. While reversed connection will not damage the equipment (some high-end models have reverse connection protection), it will lead to incorrect test data.

  2. Ensure adequate discharge. After operation or other tests, residual charges may remain in the transformer windings. Both high and low voltage sides must be fully discharged before testing to avoid damaging the instrument or endangering personnel safety.

  3. For special transformers (such as Zig-zag transformers, rectifier transformers). The corresponding special transformer model should be selected in the instrument's menu in advance. Using a standard model will result in significant phase errors.

Conclusion

The Transformer Turns Ratio and Vector Group Tester simplifies complex turns ratio measurements through digital sampling and phase comparison technology. Particularly, the blind test and simultaneous three-phase measurement functions truly solve on-site testing pain points. For more product information, please contact us.